Skip to content
DraperyFlow

Blog

Who calculates fabric: workroom or designer?

· DraperyFlow

On a custom window treatment, two people often think they own the yardage. The interior designer specified the cloth and quoted the client. The workroom has to cut it, match the repeat, and stand behind the finished size. When both calculate — and they calculate differently — the mill gets one number, the table gets another, and the invoice is a third. Someone pays for the extra bolt. It is rarely the person who sent the first text.

There is a clean split. The designer owns the design intent. The workroom owns the manufacturing math. The job only holds if those two things are written down as one spec, not as two opinions.

What the designer should decide

The designer is closest to the room and the client. They should lock the things that change the look, not the cut list:

  • Product: drapery pair, roman, cornice, bedding — not “something on the window.”
  • Finished look: fullness or heading, inside or outside mount, stack, control side on a shade.
  • Cloth: mill, colorway, railroaded or up the roll, COM or workroom stock.
  • Lining and the client-facing hardware, including motor if there is one.
  • The commercial terms with the client: trade discount, deposit, what “installed” includes.

A designer who also runs a workroom can wear both hats. The point is not to forbid designers from opening a calculator. The point is that the number that goes to the mill and the number that goes to the table must come from the same allowances the shop actually sews.

What the workroom should calculate

The workroom owns anything that becomes a cut. Finished width and length after the measure. Fabric width from the ticket, not from memory. Vertical repeat. Hems and board allowances. Whether the goods will railroad. How many widths, what the cut length is, and how that converts to yards rounded the way the shop buys — usually the next half yard.

That is also where COM liability lives. If a designer emails “about 12 yards” and the workroom cuts 14 because of a 24.5-inch repeat, the shortage is not a surprise. It is a missing spec. The workroom should calculate the buy, send it back as a line the designer can put on the purchase, and refuse to cut until the yards on the PO match the yards on the work order.

Why the two numbers diverge

Designers are often taught a rule of thumb: width times fullness, divide by 54, add a yard for hems. That is a conversation starter. It is not a cut list. Workrooms add the actual top and bottom hem, round each cut to the repeat, and round the buy. On romans they do not apply drapery fullness at all.

A pair of pinch-pleat panels at 2.5 times fullness with an 8-inch bottom hem and a 24.5-inch repeat will not match a “12 yards should do it” note. A flat roman will not match a drapery formula at all. If you need the roman path in detail, use the yardage note on this blog. If the designer’s quote already went to the client on the rule of thumb, the workroom is now arguing with a number the client has already accepted.

A handoff that holds

The clean sequence on a trade job looks like this.

  1. Designer specifies product, cloth, mount, and finished intent — and sends site sizes or books a measure.
  2. Workroom (or the designer’s workroom seat) calculates yardage with the shop’s hems, repeats, and rounding.
  3. That yardage is what goes on the COM PO or the mill order. Not an earlier estimate.
  4. The same specs become a work order for the table (no prices) and a quote or invoice for the client (no cuts).
  5. The designer or homeowner approves the quote. Status moves on the job. Then the floor cuts.

Retail is the same math with fewer parties. The shop still should not cut from a number that only exists in a proposal paragraph.

Who types it, if both can see the job

In a healthy trade relationship the designer does not need a second spreadsheet. They need a place to put the client, the rooms, and the approval. The workroom needs the calculator, the work order, and receiving when the COM arrives. If those live in different tools, you are back to emailing PDFs and hoping the revision in the subject line is the current one.

DraperyFlow is built for that split without splitting the data. Trade and retail clients sit in one directory. A treatment holds the calculator result. The designer can see the estimate through a Magic Link and approve it — retail totals, not workroom cost. The table gets a work order. The crew gets an install sheet. Inventory and POs, on Studio, are how COM is received against what was ordered, not against what someone remembers ordering.

Put the rule on the job, not in a meeting

Agree once, in writing, who calculates the buy. For most custom shops the workroom calculates, the designer specifies and sells. Then use one system so the number cannot drift. A 14-day Studio trial is enough to run one real house through calculate → work order → quote and see whether the argument about “who does the math” disappears.

Try the full workroom for 14 days.

All-in-one workroom management software. Full Studio trial, no credit card. Keep Starter or Studio when you are ready.