How workrooms price labor and materials
· DraperyFlow
A workroom that quotes “$2,400 a window” without splitting cloth from sewing cannot tell whether the job made money. Materials move with the mill and the repeat. Labor moves with the heading, the lining build, and the hours on the table. Install is a third number. If those three are one line, you will discover the margin after the deposit is spent.
Price the materials you will actually buy
Face fabric is yardage × the rate you sell it at — inventory retail, a COM handling fee, or a custom retail you type. Yardage is not a guess: it is widths, cut length, repeat, railroaded or not, then rounding to the next half yard. Lining, interlining, and blackout are their own cuts. They are not a percentage of the face unless your shop has a written rule and you still check the cuts.
Hardware is the rod, track, motor, rings, ripple carriers, weight bar, or roman kit — not a round-up inside labor. If it ships from a vendor, it belongs on a PO and on the invoice as hardware. If the designer supplies COM, the face-fabric retail may be zero on your invoice; lining, hardware, and labor are not zero.
DraperyFlow’s path is Specs, then Pricing & Fabric on the same treatment. Inventory can fill width, repeats, cost, and retail. You can still enter a custom cloth by hand. Those figures are what fill the invoice table by room: fabric, labor, hardware and lining. You do not retype lines.
Labor is not a vibe
Workroom labor should be a rate the shop can defend: per width, per treatment type, or a shop SKU for “pinch-pleat pair, lined, 2.5×” that you already timed. Unlined sheers are not the same hours as interlined triple pinch pleat. A flat roman is not a hobbled roman. If every heading is the same labor dollar, the complicated jobs subsidize the easy ones until they do not.
- Cutting and matching — driven by widths and repeat, not by the client’s square footage of glass.
- Sewing — heading, hems, lining build, lead and return edges.
- Finishing — pins, weights, train time, QC.
- Install — travel, hardware, a second person on a tall mount. That is not workroom labor. It is a separate line, with a client fee and an internal cost if you track both.
Trade discounts usually sit on merchandise, not on the hour. If you discount labor the same 30% you discount goods, you have given away the only part of the job you cannot return to the mill.
Estimate, then check actual
The quote uses estimated cost: calculator yardage × cost, plus the labor SKU, plus hardware. After the job, actual labor and install come from time logs. If you never compare the two, your rates are folklore. A shop that logs time on the treatment can raise the labor SKU on the next triple-fullness silk instead of quietly losing money on “the same $400 make-up we always charge.”
On Studio, DraperyFlow keeps profitability on the project: revenue, COGS, net profit, blended margin. The breakdown is fabric and lining, hardware, workroom labor, installation, and discounts. Estimated cost from the calculator; actual labor and install from time. Discounts sit on the job so they hit margin instead of a side spreadsheet.
What the client sees
The client PDF can show rooms and totals. It should not show your cost, your minutes, or your vendor. COM can show as COM with no fabric price. Internal install cost never belongs on that PDF. The work order is the opposite: cuts and cloth, no prices. Mixing those documents is how a designer forwards your cost structure to the next bid.
A workable rule
Calculate the buy. Price the goods at the rate you actually sell. Attach labor as a shop rate for that product, not a round number that feels fair. Put install on its own line. Then look at margin on the job before you send the Magic Link. If the number only exists in someone’s head, it is not a price. It is a hope.